Today, Dale came by and gave me a hand digging out the srea to put the A-Frame with his skidsteer.




We then added the drainage mat.

and covered it with three feet of clay from the surrounding area. It was a lot of work, but done in short order with a pro driving the skidsteer.

This trench is the drainage trench, dug away from the A-frame. It will serve as irrigation for my greenhouse that will run inside of it.

Once we finished leveling the pad, I brought in all the concret footings that will serve as the foundation. Each one of these blocks are 105lbs each. I had to move 38 of them…